FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2ZR-FE COOLING: THERMOSTAT: INSTALLATION

1. INSTALL THERMOSTAT

(a) Install a new gasket onto the thermostat.

(b) Install the thermostat with the jiggle valve facing upward.





HINT
The jiggle valve may be set within 10° on either side, as shown in the illustration.

2. INSTALL WATER INLET





(a) Install the water inlet with radiator hose with the 2 nuts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

3. ADD ENGINE COOLANT Service and Repair

4. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection