Installation
1NR-FE STARTING: STARTER (except Cold Area): INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter assembly with the 2 bolts.
Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)
(b) Connect the connector.
(c) Connect terminal 30 with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(d) Close the terminal cap.
2. INSTALL FLYWHEEL HOUSING SIDE COVER
(a) Insert the protruding portion into the end of the cylinder block and while pushing it along the cylinder block, fit the claw into the cylinder block.
NOTICE:
* Make sure that the claw makes a click sound, indicating that it fits tightly.
* Replace the flywheel housing side cover with a new one if it does not fit tightly or is deformed.
3. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
5. INSPECT FOR EXHAUST GAS LEAK