Installation
METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Engage the 2 claws and install the light control rheostat.
(b) Connect the connector.
2. INSTALL LOWER INSTRUMENT PANEL ASSEMBLY Installation
3. INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP LH
4. INSTALL COWL SIDE TRIM BOARD LH
HINT
Use the same procedure as for the RH side Installation.
5. INSTALL FRONT DOOR SCUFF PLATE LH
HINT
Use the same procedure as for the RH side Installation.