FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





1NR-FE ENGINE CONTROL: INTEGRATION RELAY: INSTALLATION

1. INSTALL NO. 1 INTEGRATION RELAY

(a) Connect the 4 connectors to the No. 1 integration relay.

NOTICE:
If a component has been dropped or subjected to a strong impact, replace it.

(b) Engage the 2 claws and install the No. 1 integration relay.

(c) Connect the 2 connectors to the No. 1 integration relay.

(d) Install the fusible link cover.