Installation
1NR-FE ENGINE CONTROL: INTEGRATION RELAY: INSTALLATION
1. INSTALL NO. 1 INTEGRATION RELAY
(a) Connect the 4 connectors to the No. 1 integration relay.
NOTICE:
If a component has been dropped or subjected to a strong impact, replace it.
(b) Engage the 2 claws and install the No. 1 integration relay.
(c) Connect the 2 connectors to the No. 1 integration relay.
(d) Install the fusible link cover.