Main Relay (Computer/Fuel System): Testing and Inspection
1NR-FE ENGINE CONTROL: INTEGRATION RELAY: INSPECTION
1. INSPECT NO. 1 INTEGRATION RELAY
(a) Inspect the EFI relay resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the No. 1 integration relay.
(b) Inspect the C/OPN relay resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the No. 1 integration relay.
(c) Inspect the IG2 relay resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the No. 1 integration relay.