Installation
1NR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL DUTY VACUUM SWITCHING VALVE
(a) Install the duty vacuum switching valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the vacuum hose and the purge hose.
(c) Connect the duty vacuum switching valve connector.