Installation
1NR-FE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL ECU BRACKET
(a) Install the ECU bracket onto the ECM with the 2 screws.
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
2. INSTALL ECM
(a) Temporarily install the ECM with the 5 bolts.
NOTICE:
If a component has been dropped or subjected to a strong impact, replace it.
(b) Tighten the 4 bolts A to the specified torque. Then tighten bolt B to the specified torque.
Bolt A - Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
Bolt B - Torque : 13 Nm (127 kgf-cm, 10 ft-lbf)
(c) Engage the clamp and connect the wire harness to the ECU bracket.
(d) Pull down the lever to engage the lock and connect the 2 connectors to the ECM.
3. INSTALL NO. 1 AIR CLEANER INLET
(a) Engage the 2 claws and install the No. 1 air cleaner inlet.
4. INSTALL WINDSHIELD WASHER JAR ASSEMBLY
Installation
5. PERFORM INITIALIZATION
Service Precautions