FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





U760E AUTOMATIC TRANSMISSION / TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION

1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY

(a) Align the protrusions of the park/neutral position switch assembly.





Text in Illustration





(b) Install the park/neutral position switch assembly to the control shaft with the 2 bolts.

Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)

NOTICE:
* Before installing the park/neutral position switch, remove any dirt or rust on the installation portion of the control shaft. Be sure to install the switch straight along the shaft while being careful not to deform the plate spring that supports the shaft. If the plate spring is deformed, the park/neutral position switch cannot be reinstalled correctly.
* After installing the park/neutral position switch, confirm that the 2 protrusions on the switch are aligned.

(c) Install the transmission control shaft lever to the control shaft with the nut and spring washer.

Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)

(d) Attach the 2 wire harness clamps.

(e) Connect the park/neutral position switch connector.

2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

(a) Connect the transmission control cable to the transmission control shaft lever with the nut.

Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)

NOTICE:
Before connecting the transmission control cable assembly, check that the park/neutral position switch is in the N position and the shift lever is in N.

3. INSTALL AIR CLEANER CASE Installation

4. INSTALL AIR CLEANER CAP AND HOSE Installation

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

6. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION On-Vehicle Inspection

7. INSPECT SHIFT LEVER POSITION On-Vehicle Inspection