Installation
2AR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 2 bolts.
Torque : 52 Nm (530 kgf-cm, 38 ft-lbf)
(b) Install the wire harness clamp bracket with the bolt.
Torque : 8.4 Nm (85 kgf-cm, 74 in-lbf)
(c) Connect the generator wire with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(d) Install the terminal cap.
(e) Connect the generator connector.
2. INSTALL WIRE HARNESS CLAMP BRACKET
(a) Install the clamp bracket with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Attach the wire harness clamp to the clamp bracket.
3. INSTALL FAN AND GENERATOR V BELT
Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.