Power Distribution Relay: Testing and Inspection
2ZR-FE STARTING: ACC CUT RELAY: INSPECTION
1. INSPECT ACC CUT RELAY
(a) Check the resistance.
(1) Measure the resistance according to the value (s) in the table below.
Standard resistance:
(2) If the result is not as specified, replace the relay.