Body - Sunroof Initialization Procedure
S-SB-0019-09April 6, 2009
Initialization of Moon Roof During PDS
Service Category
General
Section
Pre-Delivery Service
Market
USA
Applicability
Introduction
When the DCC fuse has been removed or the battery is disconnected, the power moon roof "AUTO" opening functions and "jam protection" are rendered inoperative. Perform the following procedure to re-initialize the moon roof during Pre-Delivery Service (PDS).
NOTE
Anytime the battery terminal has been disconnected, the moon roof MUST be re-initialized.
Warranty Information
Initialization Procedure
1. Cycle the ignition to the "IG-ON" position.
2. Push the "OPEN" side of the moon roof switch to open the moon roof HALFWAY
3. Push the "CLOSE" side of the moon roof switch and hold for 2 seconds after the motor stops.
4. Verify proper operation of "AUTO" mode.
NOTE
Jam protection function is enabled through the above initialization procedure.