FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








2ZR-FE COOLING: THERMOSTAT: INSTALLATION

INSTALLATION

1. INSTALL THERMOSTAT
(a) Install a new gasket onto the thermostat.





(b) Install the thermostat with the jiggle valve facing upward.
HINT: The jiggle valve may be set within 10° on either side, as shown in the illustration.





2. INSTALL WATER INLET
(a) Install the water inlet with radiator hose with the 2 nuts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
3. ADD ENGINE COOLANT Service and Repair
4. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection