Installation
2AZ-FE CHARGING: GENERATOR: INSTALLATION
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp bracket with the bolt.
Torque: 8.4 Nm (86 kgf-cm, 74 in-lbf)
(b) Install the generator assembly with the 2 bolts.
Bolt A - Torque: 21 Nm (215 kgf-cm, 16 ft-lbf)
Bolt B - Torque: 52 Nm (530 kgf-cm, 38 ft-lbf)
(c) Install the generator wire to terminal B with the nut.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
(d) Attach the clamp and connect the generator connector to the generator.
(e) Install the 2 wire harness clamps.
2. INSTALL FAN & GENERATOR V BELT Installation
3. INSTALL REAR ENGINE UNDER COVER RH
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 Nm (55 kgf-cm, 47 in-lbf)