Ignition Relay: Testing and Inspection
2AZ-FE ENGINE CONTROL SYSTEM: IGNITION RELAY NO. 1: ON-VEHICLE INSPECTION
ON-VEHICLE INSPECTION
1. REMOVE INSTRUMENT PANEL FINISH LOWER PANEL SUB-ASSEMBLY Removal
2. REMOVE NO. 1 IGNITION RELAY
(a) Remove the No. 1 ignition relay.
3. INSPECT NO. 1 IGNITION RELAY
(a) Measure resistance of the No. 1 ignition relay.
Standard resistance:
If the result is not as specified, replace the relay.
4. INSTALL NO. 1 IGNITION RELAY
(a) Install the No. 1 ignition relay.
5. INSTALL INSTRUMENT PANEL FINISH LOWER PANEL SUB-ASSEMBLY Installation