Installation
2AZ-FE ENGINE CONTROL SYSTEM: INTEGRATION RELAY: INSTALLATION
INSTALLATION
1. INSTALL INTEGRATION NO.2 RELAY
(a) Connect the 3 connectors.
(b) Attach the integration relay to the engine room relay block.
2. INSTALL NO. 1 RELAY BLOCK COVER