Installation
2ZR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
INSTALLATION
1. INSTALL DUTY VACUUM SWITCHING VALVE
(a) Install the duty vacuum switching valve with the screw.
(b) Connect the 2 hoses to the duty vacuum switching valve.
(c) Connect the duty vacuum switching valve connector and wire harness clamp.
2. INSTALL NO. 2 CYLINDER HEAD COVER Installation