Installation
2AZ-FE ENGINE CONTROL SYSTEM: ECM: INSTALLATION
INSTALLATION
1. INSTALL ECM
(a) Install the ECM with the bolt and screw.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect the 4 ECM connectors.
(c) Install the wire harness clamp.
2. INSTALL GLOVE COMPARTMENT DOOR Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. PERFORM INITIALIZATION
(a) Perform initialization Testing and Inspection.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.