Automatic Transaxle
INSPECTION1. INSPECT FRONT SUSPENSION NO. 1 LOWER ARM SUB-ASSEMBLY LH
a) As shown in the illustration, flip the ball joint stud back and forth 5 times before installing the nut.
b) Using a torque wrench, turn the nut continuously at a rate of 2 to 4 seconds per turn and take the torque reading on the fifth turn.
HINT: A bolt without a torque specification is shown in the standard bolt chart.