High Pitched Horn Assy
HIGH PITCHED HORN ASSEMBLYREPLACEMENT
1. REMOVE HIGH PITCHED HORN ASSEMBLY
a. Disconnect the connector.
b. Remove the bolt and horn.
2. INSTALL HIGH PITCHED HORN ASSEMBLY
a. Attach the horn stay to the body panel and then install the horn with the bolt.
Torque: 19.5 N�m (199 kgf�cm, 14 ft�lbf)
b. Connect the connector.