2-3 Shift Solenoid Valve Replacement
2-3 Shift Solenoid Valve Replacement
Removal Procedure
1. Remove the control valve body cover. Refer to Control Valve Body Cover Replacement (Control Valve Body Cover Replacement) .
2. Remove the 2-3 shift solenoid valve bolt (314) and the 2-3 shift solenoid valve (313).
Installation Procedure
Notice: Refer to Fastener Notice (Fastener Notice) .
1. Install the 2-3 shift valve solenoid valve (313) and the bolt (314).
Tighten the bolt to 5.9-7.4 N.m (51-66 lb in).
2. Install the control valve body cover. Refer to Control Valve Body Cover Replacement (Control Valve Body Cover Replacement) .