Installation
1. Install solenoid into shifter assembly. Connect plastic retainer at solenoid base and at the park lock lever.2. Connect BTSI connector.
3. Verify operation. (Refer to "System Performance Test.")
4. Install console. (Refer to "Console Installation" procedure.)
5. Enable the SIR System. (Refer to "Enabling the SIR System".)