FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

SID Module - Rain Sensor



Control Module Connection Test Values, Rain Sensor







Scope
This section contains the readings and instructions for measuring voltage levels on the SID unit.

Remember
- Observe the conditions set for testing and use common sense when assessing the results.
- First make sure that the control module is receiving power and that it is grounded.
- Then check all the sensor inputs and signals from other systems.
- Finally check the control module outputs. Remember that the test readings do not indicate whether the actuator is working.
- If a test value is incorrect, consult the wiring diagram to trace which leads, connectors and components should be checked more thoroughly.
- The specified test readings refer to those obtained with a calibrated Fluke 88/97.
- The test readings show the signal's pulse ratio and pulse duration. A test instrument capable of giving pulse ratio and pulse duration readings should be used. The sign indicates a positive trigger pulse, TRIG+.







Control Module Connection





Pin No. 1-9: