Output Shaft Bearing
NOTE: Component identifier numbers used in the following illustrations relate to specific steps in the procedures below.REPLACEMENT
1. Push out the bearing with puller ring tool No. 87 92 178 (20 teeth), 87 92 004 (21 teeth) or 87 92 160 (22 teeth) and fixture (mother tool) tool No. 87 90 636, or equivalent.
2. Press on a new bearing until it reaches the bottom, using tools press ring tool No. 87 92 202 and sleeve tube tool No. 87 91 204, or equivalent.