FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM
:
Car repair manuals for everyone.
Home
>>
Pontiac
>>
2010
>>
Vibe FWD L4-2.4L
>>
Repair and Diagnosis
>>
Transmission and Drivetrain
>>
Automatic Transmission/Transaxle
>>
Service and Repair
>>
Overhaul
>>
MVD 5 Speed - Automatic Transmission
>>
36. Front Carrier Assemble
36. Front Carrier Assemble
Front Carrier Assemble
1.
Using a screwdriver, install the front internal gear and snap ring to the 2nd clutch hub.
2.
Install the front carrier (1) to the 2nd clutch hub.