Intermediate Pipe - Single Pump
REMOVAL PROCEDURECAUTION: Refer to Vehicle Lifting Caution in Service Precautions.
1. Raise the vehicle.
2. Remove the bank 2 intermediate pipe/hose from the AIR pump.
3. Lower the vehicle.
4. Loosen the pinch clamp connecting the bank 2 intermediate pipe/hose to the bank 2 shut-off valve.
5. Remove the bank 2 intermediate pipe/hose.
INSTALLATION PROCEDURE
1. Install the bank 2 intermediate pipe/hose.
2. Install the pinch clamp connecting the bank 2 intermediate pipe/hose to the bank 2 shut-off valve.
CAUTION: Refer to Vehicle Lifting Caution in Service Precautions.
3. Raise the vehicle.
4. Install the bank 2 intermediate pipe or hose and clamp the pipe hose to the AIR pump.
5. Lower the vehicle.