Removal And Installation
CONTROL LINKAGE
Removal and Installation
REMOVAL
1.Remove instrument lower panel (LH). Instrument Lower Panel LH.
2.Remove console side finishers (LH) and (RH). Exploded View.
3.Remove shift selector handle.
4.Remove M/T finisher. Exploded View.
5.Move shift selector to the neutral position.
6.Remove the air filter assembly. Service and Repair (QR25DE), Service and Repair (VQ35DE).
7.Remove the shift cable from the shift lever and cable bracket.
8.Remove the select cable from the select lever and cable bracket.
9.Disconnect EVAP drain hose.
10.Remove the shift cable from the shift selector assembly.
11.Remove the select cable from the shift selector assembly.
12.Remove the bracket covering the retainer grommet.
13.Remove the retainer grommet bolts and retainer grommet.
14.Remove the shift cable and select cable from the vehicle.
INSTALLATION
Installation is in the reverse order of removal.
- Adjust select cable as necessary. Adjustments.
- After assembly, make sure shift selector automatically returns to Neutral position when it is moved to 1st/2nd or reverse gate.
- When shift selector is moved to each position, make sure there is no binding or disconnection of cables.