Shift Solenoid: Testing and Inspection
SOLENOID VALVES- For removal and installation, refer to "ON-VEHICLE SERVICE".
Resistance Check
- Check resistance between two terminals.
Operation Check
- Check solenoid valve by listening for its operating sound while applying battery voltage to the terminal and ground (bracket).
Fluid Temperature Sensor
Check resistance between terminals (33) and (35) while changing temperature as shown at left.