Rocker Arm Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Rocker Arms | ||||
| Right Bank | 5.9 | 4.0 | B | Includes: R&R Valve Covers. |
| Left Bank | 2.1 | 1.5 | B | Includes: R&R Valve Covers. |
| Both Banks | 6.6 | 4.9 | B | Includes: R&R Valve Covers. |
| Rocker Shaft | ||||
| Right Bank | 5.9 | 4.0 | B | Includes: R&R Valve Covers. |
| Left Bank | 2.1 | 1.5 | B | Includes: R&R Valve Covers. |
| Both Banks | 6.6 | 4.9 | B | Includes: R&R Valve Covers. |