Rocker Arm Assembly: Labor Times
Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
Replace | ||||
Rocker Arms | ||||
Right Bank | 1.5 | 1.1 | B | Includes: R&I Valve Cover. |
Left Bank | 3.4 | 2.4 | B | Includes: R&I Valve Cover. |
Both Banks | 4.6 | 3.1 | B | Includes: R&I Valve Cover. |
Rocker Shaft | ||||
Right Bank | 1.5 | 1.1 | B | Includes: R&I Valve Cover. |
Left Bank | 3.4 | 2.4 | B | Includes: R&I Valve Cover. |
Both Banks | 4.6 | 3.1 | B | Includes: R&I Valve Cover. |