Rocker Arm Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Rocker Arms | ||||
| Right Bank | 1.5 | 1.1 | B | Includes: R&I Valve Cover. |
| Left Bank | 3.4 | 2.4 | B | Includes: R&I Valve Cover. |
| Both Banks | 4.6 | 3.1 | B | Includes: R&I Valve Cover. |
| Rocker Shaft | ||||
| Right Bank | 1.5 | 1.1 | B | Includes: R&I Valve Cover. |
| Left Bank | 3.4 | 2.4 | B | Includes: R&I Valve Cover. |
| Both Banks | 4.6 | 3.1 | B | Includes: R&I Valve Cover. |