Multiple Junction Connector: Service and Repair
Installation:
Installation:
To install SMJ, tighten bolts until Orange "fulltight" mark appears and then retighten to specified torque as required.
3-5 N-m
(0-3 - 0.5 Kg-m, 26 - 43 in-Lb)
CAUTION: Do not overtighten bolt, otherwise, it may be damaged.