Power and Ground Distribution: Testing and Inspection
INSPECTION
RHEOSTAT SWITCH CHECK
1. Connect the battery and the test bulb (40W) as shown in the illustration.
2. Operate the rheostat, and if brightness changes smoothly without switching off, rheostat function is normal.