Variable Induction Control Solenoid: Testing and Inspection
INSPECTION VARIABLE AIR INTAKE SOLENOID CHECK1. Connect a hand vacuum pump to nipple (A) of the solenoid.
2. Check air tightness by applying a vacuum with voltage applied directly from the battery to the variable air intake solenoid and without applying voltage.
3. Measure the resistance between the terminals of the solenoid.
Standard value: 29 - 35 ohms [at 20 °C (68 °F)]