Cylinder Head Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Right Side | 11.8 | 8.3 | A | Includes: Transfer All Necessary Components And Grind Valves. |
| Left Side | 11.4 | 8.0 | A | Includes: Transfer All Necessary Components And Grind Valves. |
| Both Sides | 16.7 | 12.0 | A | Includes: Transfer All Necessary Components And Grind Valves. |
| NOTE | ||||
| With Intake Manifold Tuning System, Add | ||||
| Right Side | 1.2 | 0.9 | A | |
| Left Side | 0.8 | 0.7 | A |