FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Pinout Values and Diagnostic Parameters

TERMINAL VOLTAGE CHECK CHART





1. Measure the voltages between terminals (16) and (19) (ground terminals) and each respective terminal.
2. The terminal layouts are shown in the illustration provided.

RESISTANCE AND CONTINUITY BETWEEN HARNESS-SIDE CONNECTOR TERMINALS





1. Turn the ignition switch off and disconnect the ABS-ECU connectors before checking resistance and continuity.
2. Check them between the terminals indicated in the table provided.
3. The terminal layouts are shown in the illustration provided.