FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace15.711.0AIncludes: R&I Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Note
With AC, Add0.50.3A
With AWD, Add0.50.3A
With Auto Trans, Add0.80.5A
To Overhaul Cylinder Head, Add
One Bank8.76.2A
To Renew Main Bearings, Add6.80.0A
To Renew Crankshaft, Add6.80.0A
To Renew Rocker Arm Assembly, Add
Right Bank0.60.0A
Left Bank1.00.0A
To Renew Timing Belt, Add1.60.0A
To Renew Camshaft, Add
Right Bank
One1.90.0A
Both2.00.0A
Left Bank
One2.10.0A
Both2.20.0A
To Clean Oil Pump Screen, Add0.20.0A