| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
All Cylinders | 23.3 | 0.0 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
One Cylinder |
Right Bank | 17.3 | 0.0 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Left Bank | 15.4 | 0.0 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Both Banks | 20.7 | 0.0 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
NOTE |
To R&R Connecting Rod Bearing, Add |
Each | 0.1 | 0.0 | A | |
To R&R Piston, Pin or Connecting Rod, Add |
One | 0.2 | 0.0 | A | |
Each Additional | 0.1 | 0.0 | A | |
All | 0.7 | 0.0 | A | |