Crankshaft End Play
Crankshaft End PlaySpecial Tools:
1. Using special tool, measure the end play (2.0L shown).
- Measure the end play by lifting the crankshaft using a lever.
- If the value is out of the specification, install new thrust half rings to take up the end float and repeat the measurement.