Sunroof / Moonroof Switch: Testing and Inspection
1. Measure the resistance between the following:2. If all measurements of the roof opening panel adjust switch are as noted, return to the pinpoint test. Pinpoint Tests
Otherwise install a new roof opening panel adjust switch.