FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Cylinder Head Assembly

Combustion Chamber Volume
Time Required For Plunger To Leak Down 1.6mm(0.06in) Of Travel With 222 N Force And Leak Down Fluid In Tappet.
52 + / - .5
Valve Arrangement(Front To Rear) Left Hand E-I-E-I-E-I-E-I
Right Hand I-E-I-E-I-E-I-E
Right Cylinder Head Rear wiring Harness Bracket Bolt And Stud 15-22
Ground Strap Nut Near RH Cyl Head 89
Camshaft Bearing Cap Bolts 71.4-107.1
Crash Bracket Nut And Bolt,Rear LH Cyl Head 15-22
Cylinder Head Bolts
Use new bolts.
Stage 1 27-32
Stage 2 Rotate 85-95 degrees
Stage 3 Rotate 85-95 Degrees