| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
All Cylinders | 14.7 | 10.5 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
One Cylinder |
Right Bank | 9.8 | 7.1 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Left Bank | 9.4 | 7.3 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
Both Banks | 11.8 | 8.3 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
NOTE |
To R&R Connecting Rod Bearings, Add |
Each | 0.1 | 0.0 | A | |
To R&R Piston, Pin or Connecting Rod, Add |
One | 0.2 | 0.0 | A | |
Each Additional | 0.1 | 0.0 | A | |
All | 0.9 | 0.0 | A | |
To Grind Valves, Add |
One Bank | 2.6 | 2.3 | A | |
Both Banks | 5.0 | 4.4 | A | |
With Cruise Control, Add | 0.1 | 0.0 | A | |
Spark Plugs, Add | 0.6 | 0.0 | A | |