FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All Cylinders14.710.5AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
One Cylinder
Right Bank9.87.1AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Left Bank9.47.3AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Both Banks11.88.3AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
NOTE
To R&R Connecting Rod Bearings, Add
Each0.10.0A
To R&R Piston, Pin or Connecting Rod, Add
One0.20.0A
Each Additional0.10.0A
All0.90.0A
To Grind Valves, Add
One Bank2.62.3A
Both Banks5.04.4A
With Cruise Control, Add0.10.0A
Spark Plugs, Add0.60.0A