Turbine Torque Check
1. Install End Play Checking Tool T80L-7902-A and End Play Checking Tool Sleeve T94P-77000-V into the turbine splines in the torque converter.
2. Install a torque wrench and determine the torque required to turn the turbine.
3. If the torque exceeds 6 Nm (4.4 ft. lbs.), replace the torque converter.