FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All Cylinders19.713.6AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
To Renew Main Bearings, Add Add2.40.0A
To Renew Crankshaft, Add6.80.0A
To Renew Piston, Pin or Connecting Rod, Add
One0.20.0A
Each Additional0.10.0A
All0.90.0A
To Renew Timing Chain or Gears, Add
Right Side1.90.0A
Left Side2.00.0A
Both Sides2.00.0A
To Renew Oil Pump, Add3.80.0A
To Clean Oil Pump Screen, Add0.10.0A
To Renew Valve Lifters, Add Add2.30.0A
To Renew Camshaft, Add
Right Bank2.00.0A
Left Bank2.00.0A
Both Banks2.70.0A
To Perform Tune-Up, Add0.90.0A
One Cylinder
Right Bank15.911.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank15.911.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks16.411.3AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.