TA5 - Check PNP/CPP Switch
- Key "OFF".
- Breakout box installed, Powertrain Control Module (PCM) disconnected.
- Locate Park Neutral Position (PNP) switch (on transmission) and Clutch Pedal Position (CPP) switch (at clutch pedal linkage).
- Disconnect vehicle harness at both switches and inspect connectors for pushed back pins.
- Measure resistance across the PNP switch terminals with transmission in "NEUTRAL" and across the CPP switch terminals with the clutch pedal "DOWN".
- Is each resistance less than 5.0 ohms?
Yes -- Go to TA6. TA6 - Check PNP/CPP Harness
No -- Replace open switch. Remove breakout box. Reconnect all components. Rerun quick test. Quick Test Appendix (Detailed Testing Instructions)