STI1 - Check STI Wire to PCM For Open
- Key OFF.
- Install Breakout Box (leave PCM disconnected).
- Measure the resistance between BOB Test Pin STI and data link connector PCM STI (TEN).
- Is the resistance less than 5 ohms?
Yes -- Go to STI2. STI2 - Check STI Wire to PCM For Short
No -- Service the PCM STI wire for opens.