SML1 - Check SML Wire For Open
- Key OFF.
- Install Breakout Box (leave PCM disconnected).
- Measure the resistance between BOB Test Pin SML and data link connector SML terminal.
- Is the resistance less than 5 ohms?
Yes -- Go to SML2. SML2 - Check SML Wire For Short
No -- Service the data link connector SML wire to PCM for opens.