HA7 - Check Resistance of Injector(s) and Harness - MFI Engines
- Key "OFF".
- Disconnect Powertrain Control Module (PCM). Inspect for damaged or pushed out pins, corrosion, loose wires, etc. Service as necessary.
NOTE: This erases the continuous memory.
- Install breakout box, leave PCM disconnected.
- Measure resistance of injector bank 1 between test pin 37 and test pin 58 at the breakout box. Record resistance.
- Measure resistance of injector bank 2 between test pin 37 and test pin 59 at the breakout box. Record resistance.
- Refer to Injector Resistance Specification Table 1.
- Is each resistance within specification?
Yes -- Go to HA12. HA12 - Check Injector Driver Signal
No -- Go to HA9. HA9 - Check Continuity of Fuel Injector Harness