HE51 - Inspect Upstream Pressure Hose For Plugging
NOTE: It is essential that the DPFE pressure hose used is the correct service part and not a substitute.
- Visually inspect upstream pressure hose routing. Hose should not be pinched or have dips in it where water could settle or freeze.
- Carefully remove upstream pressure hose and inspect for plugging, water or leaks.
- Is there a fault detected In the hose?
YES -- SERVICE or REPLACE upstream pressure hose as necessary. Complete PCM reset to clear DTCs. Clearing Diagnostic Trouble Codes
Rerun quick test. Diagnostic Subroutines (DSR) - Extracting Codes
NO -- GO to HE52. HE52 - Check Orifice Tube Assembly and DPFE Sensor