KA8 - Check EVR Solenoid Signal Harness Circuit For Short
- Key "OFF".
- EVR solenoid disconnected.
- Breakout box installed, PCM disconnected.
- Measure resistance between test pin 31 and test pins 37 and 57 at breakout box.
- Measure resistance between test pin 31 and test pins 40, 46 and 60 at breakout box.
- Is each resistance greater than 10,000 ohms?
Yes -- Replace PCM. Remove breakout box. Reconnect all components. Rerun quick test. Quick Test Appendix (Detailed Testing Instructions)
No -- Service short circuit. Remove breakout box. Reconnect all components. Rerun quick test. Quick Test Appendix (Detailed Testing Instructions)