PGC2 - Check Grounds
- Key OFF.
- Install Breakout Box (leave PCM disconnected).
- Measure the resistance between BOB Test Pin GND and ground. Repeat for each BOB Test Pin GND to ground.
- Are the resistances less than 5 ohms?
Yes -- If sent here from EEC Pinpoint Test VREF or STO, or 4EAT Pinpoint Test VREF, Replace the PCM.
Otherwise, Return to Diagnostic Routines. Testing and Inspection
No -- Service the wire in question.